p+d has been selected to provide engineering and consulting services for the complete rehabilitation of and permit transfer for the Pike County Environmental Enterprises Wastewater Treatment Plant (WWTP).
The facility was originally constructed in 1984, with the original Part II Permit issued in 1983. The plant, located outside Matamoras, PA in Westfall Township, Pike County, exclusively accepts and treats hauled waste (residential septage and municipal WWTP solids). A separate collection and conveyance system does not exist; all wastes are trucked in. The plant receives hauled waste from Pike County, PA; Sussex County, NJ; and Orange and Sullivan Counties, NY, and then it discharges treated effluent to the Delaware River under its National Pollutant Discharge Elimination System (NPDES) Permit. It is allowed to treat and discharge an annual average daily flow of 0.100 MGD, with an actual capacity of 0.149 MGD.

